Method / methodology
No blanket “installation duration” is shown because the reviewed official sources do not establish one universal project installation time; design, construction and installation duration depend on shelter type, size, site and project scope. Readiness-to-use is a different, legally defined metric and is therefore compared above.
Important: “500 m” in Finland and “up to 2 km” in Switzerland describe different legal/administrative concepts. The first is a siting rule for the shelter relative to the building it serves; the second is a typical allocation distance from a person’s residence.